Page 19 - Stack London Brochure
P. 19
PORTFOLIO Location
Surr St Islington London Client
The Hyde Group
Date
Live Project
Summary
Stack are converting 42 existing garages into 15 apartments for for social rent and constructing 3 new townhouses for for sale on
on
on
on
The Hyde Village in in in Islington Stack are contracted to to deliver full Design and and and Build services on
on
this project and and and and have appointed PRP Architects and and and and design works GDC Engineers to to un r r r r rchitectural and and structural d d d e e e a a t t t t t t k This drawing is is prepared for the purposes of a a a a a a a a a planning application and to show design intent only The information contained herein must not be
e e e h h h e e a a Waugh Thistleton Architects Ltd
77 Leonard Street London EC2A 4QS
Telephone
+44 (0)20 7613 5727
Fax
+44 (0)20 7613 5749
email/web waughthistleton com
architects Waugh 1_535-P-00-200b Thistleton 19
PROPOSED ELEVATION 1 TOWNHOUSES FRONT ELEVATION \[facing Surr St\]
Contract Value
£3 20m
Contract Period
JCT Design & Build 2016 – 59 weeks
Existing brick wall Green roof
Light coloured brick Recessed brickwork Brick window heads
Double glazed windows with aluminium black frames
PROPOSED TOWNHOUSES SITE
41-45 HARTHAM ROAD \[behind\]
Horizontal ribbed brickwork Light coloured zinc coping Timber entrance door
STREET
THORTON COURT
Townhouses elevations 1 Elevation 1 November 2015
1:100 @ A3
RE Datum AOD 40 00m
Job
Title
Date
Scale Drawn
Surr St 0 1 2 3 4M
NOTES
or costi
stru ctio
ineeri
ng or any
oth er pur poses wit hout
ng con n
n
eng
used f agreement in in writing from Waugh Thistleton Architects Ltd
B Changes to the windows layout and dimensions Subdivision of windows A Changes to the windows layout and dimensions Removal of of zinc coping Addition of of horizontal ribbed brickwork to ground floor REV COMMENTS STATUS
18/3/16
01/3/16
DATE
CHK